Multi-Cluster Dial Plan Maintenance

In contrast with the Dial Plan Maintenance view, the Multi-Cluster Dial Plan Maintenance allows for a selected Dial Plan to be added to or removed from multiple Unified CM Clusters in a single step.

Procedure

Both modes of the tool work in the same manner:

  1. Choose the Dial Plan Name to manage on the Unified CM clusters.

    The dial plan tag allows only dial plans meant for a specific hierarchy use to be shown. The Chosen Dial Plan Type shows this.

  2. An operation is chosen from the Operation drop-down.

  3. Select the Unified CM clusters from the Available transfer box so these are shown in the Selected box.

  4. Click Save to carry out the task.

Notes

  • All dial plan elements are added to or removed from the selected clusters in accordance with the selected operation.
  • The operation’s transaction log sub-transactions Detail column show dial plan, hierarchy and target cluster.
  • If for example a site level dial plan is selected, this tool will check the Unified CM of the Network Device List (NDL) belonging to the site to verify if a dial plan is applied to this Unified CM.
  • Sites cannot be excluded if a site level dial plan is applied. in the cluster.