Set Up Route Patterns

Procedure

  1. In VOSS-4-UC, select Device Management > CUCM > Route Patterns.
  2. Click Add.
  3. On the Pattern Definition tab, from the CUCM drop-down, choose the CUCM and then enter the Route Pattern name and description.
  4. From the Route Partition drop-down, choose the required route partition.
  5. In the Destination (Only Choose Route List or Gateway) section of the page, choose either a Route List or Gateway/Trunk from the respective drop-down.
  6. Click Save.